精产品99永久免费网页版,伊人成色综合网,徐婷被房东揉到高潮的视频,无码无套少妇毛多18pxxxx,欧洲熟妇色

NHI Headlines

North extension line of Shenyang metro line 2 finished smoothly

Published:2016-04-11

Recently, the transfixion of the section 6of north extension line for Shenyang metro line 2 has been finished smoothly,which is manufactured by NHI. It adopts the Φ 6.28m Earth-pressure balanceTBM, and the total tunneling mileage is 1502m. (Wang Yao)