精产品99永久免费网页版,伊人成色综合网,徐婷被房东揉到高潮的视频,无码无套少妇毛多18pxxxx,欧洲熟妇色

NHI Headlines

NHI’s TBM creates a successful open for the extension line between Beijing and Tianjin

Published:2015-04-07

Recently, that the Φ11.97m slurry balance TBM calledNO. 45 of SHMG emerged through 18 months work. It marks the successful open for the extension line between Beijing and Tianjin, which is the national key construction project in China.

The full length of the extension line between Beijing and Tianjin is 44.815 kilometers, for the only one TBM tunnel with 2.8 kilometers; the Φ11.97m bentonite slurry balance TBM with air cushion type from our company is used in the part of 2.25 kilometers. The installed total power of the equipment is 3960kw. The length of main body is 50 meters and the weight is 1300 tons.

It creates another successful achievement after that NHIs TBM is used in the national projects of high-speed rail SHIZIYANG tunnel between Guangzhou and Shenzhen, Wuhan river tunnel as the first tunnel of Yangtze River, the railway underground line for Beijing and Tianjin in China.